This project, located in El Vigia City, Merida, Venezuela, is a turn-key project on the basis of engineering, procurement, construction and commissioning. It is to build a gas turbine combined cycle power plant with installed capacity of 583MW designed as bifuel system with diesel oil as fuel in the early stage and natural gas in the later stage, and to build a new 230kV substation, a 230kV substation extension, and a 230kV transmission line with total length of 56km.